
Validating the system that prints your labels
In a GMP plant, the label printing system is a computerised system like any other. An inspector can ask how you know it prints the right layout with the right data, who changed the layout last, and whether a reprint can happen without a trace. This page sets out the four texts those questions come from.
The rules
| Text | Version in force | What it covers |
|---|---|---|
| EU GMP Annex 11, Computerised Systems | January 2011, in operation since 30 June 2011 | Validation, audit trails, change control, security and electronic signatures for GMP systems in the EU |
| 21 CFR Part 11 | 20 March 1997, read with the FDA scope guidance of August 2003 | Electronic records and signatures, for products sold in the United States |
| GAMP 5, Second Edition | ISPE, July 2022 | The industry guide to a risk-based approach to validating computerised systems |
| Data integrity guidance | PIC/S PI 041-1 (2021), MHRA (2018), FDA (2018), WHO TRS 1033 Annex 4 (2021) | The ALCOA+ principles for records |
In Switzerland, the Medicinal Products Licensing Ordinance makes both EU GMP and the PIC/S GMP Guide binding for manufacturers, and the stricter of the two applies.
A revision of Annex 11, together with a new Annex 22 on artificial intelligence, went to public consultation from July to October 2025. As of the date below it has not been adopted, so the 2011 text is the one inspectors apply. We will update this page when the revision is published.
What they ask of a label system
Audit trail. Every change to a label layout, and every print, is recorded with who, what and when, and the record cannot be edited.
Annex 11 section 9, Part 11 section 11.10(e).
Access control. Only authorised people can design, approve or print, each with their own login.
Annex 11 section 12, Part 11 section 11.10(g).
Change control. A layout used in production is a controlled document. A new version is approved before it can be printed.
Annex 11 section 10.
Electronic signatures, where you approve layouts electronically: the signature shows the signer's name, the date and time and its meaning, such as approval, and it is linked to the record.
Annex 11 section 14, Part 11 sections 11.50 and 11.70.
Validation. Documented evidence that the system, as you configured it, does what your requirements say.
Annex 11 section 4.
GAMP 5 sorts software into categories.
A label design and print system that is configured but not programmed is usually treated as category 4, configured software. A custom interface built for your SAP system would be category 5. The category decides how much testing is proportionate.
What the label software does
For regulated plants we sell and configure these TEKLYNX products:
LABEL ARCHIVE: version history for every label, a full audit history of changes, comments and prints, user roles and permissions, and approval workflows.
TEKLYNX CENTRAL: label management with approval by electronic signature.
Validation Accelerator Pack: IQ, OQ and PQ protocol worksheets and a validation plan and report template, sold with CODESOFT plus LABEL ARCHIVE, or with TEKLYNX CENTRAL.
What stays with you
- Your user requirements, your risk assessment and the decision that the system is fit for use.
- Your procedures: who may approve a layout, how a reprint is authorised, how often the audit trail is reviewed.
- Reviewing the audit trail. The software records; somebody in your quality unit has to read the record.
Who does what across a whole project is set out step by step in 1.3 Project responsibilities.

Last checked: 13 October 2026.
Preparing a validation, an inspection or a change to your labels?
The first engagement is free: a half-day review of your current label print chain, ending in a written list of gaps.





