Numaco Labeling
 
Numaco Labeling
Validation and standards

IQ, OQ and PQ for label printing systems

Last checked: 13 October 2026.EU GMP Annex 15

EU GMP Annex 15 defines three qualification steps. For a label printing system they mean, in practice:

  1. 01IQ, installation qualificationThe system as installed matches the approved design and the manufacturer's recommendationsThe right software versions, licences, printers, drivers and firmware are installed where the specification says
  2. 02OQ, operational qualificationThe system performs as intended across its operating rangeEach template prints the right data in the right place, access rights hold, the audit trail records, and errors are caught, for example a missing field or an offline printer
  3. 03PQ, performance qualificationThe system performs effectively and reproducibly with your process and productsThe labels your production needs print correctly, on your lines, with your materials, over a defined period
123

What we deliver

For a label system we install and configure, your team owns the protocols and we support it:

IQ support: we help your team draft and execute the IQ protocol: installed software and versions, licences, printers with serial numbers and firmware, connections to the data source.

OQ support: we help your team draft and execute the OQ protocol: one test per requirement in your URS, with expected and actual results, screenshots and test prints.

Traceability matrix: each URS requirement mapped to the test that covers it.

PQ support: support while you run the PQ. The PQ is yours, because only you can run it in production.

Where the software vendor offers a validation package, such as the TEKLYNX Validation Accelerator Pack, we build on it rather than start from a blank page.

Documents are in English, German or Italian, as PDF and as editable files, so your quality unit can carry them into its own templates.

For which systems

TEKLYNX label software, and Zebra and cab label printers.

You

What stays with you

Approving every protocol before it is executed, approving the results, writing the validation report and releasing the system. See 1.3 Project responsibilities.

Last checked: 13 October 2026.

Talk to us

Preparing a validation, an inspection or a change to your labels?

The first engagement is free: a half-day review of your current label print chain, ending in a written list of gaps.