Numaco Labeling
 
Empty industrial warehouse shelving
About us

How we work

Every project runs in four steps: a free half-day review, a solution design, implementation, and support after go-live.

They are set out on 3.3 Project management and delivery.

For a regulated plant, 1.3 Project responsibilities sets out who does what at each of the twelve steps of a validation project: you, Numaco or the software vendor.

From the first message to a written scope

  1. 1.

    You write or call: [email protected] or +41 76 805 67 79. A person reads every message.

  2. 2.

    The free first review: half a day with your labels, your printers and the systems that feed them, ending in a written list of gaps.

  3. 3.

    A written proposal: the printers, software, connection and label materials we propose, what each costs and why we chose it. If something you already own does the job, we say so.

  4. 4.

    A written scope. Anything outside it is quoted before it is done.

Quality: what we do

  • Changes in writing.

    Changes during a project are agreed in writing before we make them.

  • Labels tested with the real data.

    On SAP projects we test every label against the data SAP actually sends.

  • Your change control on validated systems.

    We do not change a template on a validated system without a change request you have approved, and we document every change against that request.

  • Documents you can hand on.

    At handover, the templates, the printer settings and the connection to your system are documented, so your own team, or another supplier, can take over.

  • Specifications we sign.

    The functional and configuration specification and the traceability matrix are signed by us, in English, German or Italian, as PDF and as editable files.

  • Rule pages with a date.

    Every page on a labelling rule names the revision it describes and the date we last checked it. We check each one twice a year.

  • Claims we can stand behind.

    We say what a system does and what stays with you. Whether your process meets a rule is for your quality unit and your inspector to judge, so we never claim it on your behalf.

  • What we do not offer yet.

    Grading printed barcodes needs a verifier, which we do not offer yet.